Mama Lola’s
General Contractor
Mama Lola’s
scope
Phase I & 2 Installation and Upgrade
SQFT
Phase 1 boosted electrical capacity by installing an 800A service entrance section (SES) and a pad, digging 6’ down to place conduits, backfill, and a compact. In phase 2, the project optimized efficiency by relocating disconnects, engineering a new transformer rack, and adding a 150kva transformer, tightly integrating them into the upgraded system. Phase 3 successfully executed the disconnection of generator power, seamlessly tying it into the upgraded SES, ensuring a comprehensive electrical system upgrade for Mama Lolas.