Bullard Wash

General Contractor

City of Goodyear

scope

SQFT

We completed about 950’ of trenching, Installed 1” PVC conduit and stub ups, and then backfilled. We subbed out the concrete bases but set and installed (10) 14’ light poles and (10) bollard light fixtures. Then, we pulled #10 wire and tied in power.