Subzero
General Contractor
Willmeng
scope
Tenant Improvement
SQFT
599,351
Tenant Improvement that included: • Provide and install specified lighting and controls package
• Providing fixture L9 as an equal alternate subject to approval
• Box in wall and conduit to ceiling space for special systems rough in
• Telephone mounting boards with grounding
• Provide and install of panels and transformers associated with TI scope
• Provide and install feeder conductors from DB’s to new panels in existing conduit
• Disconnect switches for all HVAC equipment
• Bussmann elevator control module
• Electric scissor lifts